Jan. 16, 2026
For any project, define these items in your RFQ: core count, conductor AWG/mm², insulation and jacket chemistry, burial rating, and any shield or bonded-shield requirement. Request datasheets and sample reels for critical runs and insist suppliers provide clear spool sizes and lead times. View More >Jan. 16, 2026
If you treat your pull control cable decision as an engineering milestone — specify materials and loads, demand test data, ensure the installation team follows proven pulling and bending rules, and verify performance on delivery — you’ll convert a potential failure point into durable, invisible infrastructure View More >Jan. 16, 2026
Treat the 12 core control cable selection like an engineering milestone: define duty (static vs flex), demand datasheets and samples for mission-critical runs, document termination and routing rules for the installation team, and enforce acceptance testing View More >